Reliable energy where
land runs out.

Powerful ocean wave

Wave Thesis

The beachhead is offshore and land-constrained markets where reliability is priced in and diesel plus logistics is the real competitor.

Target Customers

Offshore islands and marine worksites already carry high delivered-energy costs, fuel risk, and uptime pressure. That makes adoption more intuitive.

Product Design

Fully submersible and engineered around O&M economics: in-port service, standardised interfaces, monitoring, and KPI reporting.

Revenue Model

Blue Grid sells device, install, and service first; then adds availability contracts and PPAs priced below delivered diesel.

02 Operations Layer

2026

Keep offshore hours low. Standardise everything.

Service in port, simple offshore steps, telemetry, and KPI-based operations. Repeatable installation, fewer offshore hours, shared infrastructure.

In-port Service
Operations layer

In-port Service

Keep major work out of harsh offshore conditions and reduce weather-window dependence. The product is fully submersible and engineered around retrieval-first O&M economics.

THE BUSINESS PLAN

Target Customers
Phase 1 · Offshore Islands

Target Customers

1 / 3
BeachheadWave EnergyLand-scarce marketsDiesel baselineReliability priced in

Islands, marine worksites, then ports and constrained coastal grids. The business plan starts with offshore islands and marine worksites because those buyers already live with diesel-heavy generation, fuel delivery risk, and uptime requirements.

Deployment Mechanism
Phase 2 · Marine Operations

Deployment Mechanism

2 / 3
InstallationRetrieval-firstPre-lay BOSTow-out deployMinimal vessel class

Pre-lay BOS, tow-out, fast hook-up, minimal vessel class. Installation is part of the product: pre-install anchors and moorings, tow the assembled unit out, perform quick hook-up, then commission with simple operations.

Revenue Model
Phase 3 · Stacked Revenue

Revenue Model

3 / 3
Device SalePPADevice saleInstallation feeAvailability contract / PPA

Device sale, installation fee, service, and optional PPA below diesel. The business plan presents stacked profit pools: CAPEX device sale, installation package, availability service, and optional PPAs priced below delivered diesel.

04 Economics & Roadmap

bluegridenergy.com

2026

Beat diesel first.
Then compound with arrays.

Ocean horizon at sunset
$0.45-0.65
Remote diesel baseline / kWh
$0.28-0.35
Pilot target / kWh
$100-300
Savings / MWh displaced

Milestone roadmap

The economics snapshot is strong: remote diesel all-in at roughly $0.45-$0.65/kWh, pilot target at roughly $0.28-$0.35/kWh equivalent, and value creation around $100-$300/MWh displaced. Shared moorings, shared spares, predictive scheduling, and fleet data increase reliability while reducing unit cost over time.

Now - Aug 2026: Scaling and improvement[DETAILS]

1:10 flume validation, optimisation loop, and mooring R&D across 4-6 concepts.

Sept 2026 - Q2 2027: Ocean readiness[DETAILS]

1:3 prototype engineering, shared infrastructure, telemetry integration, and retrieval SOP proof.

Mid 2027 onward: Open ocean validation[DETAILS]

PacWave deployment, 1:1 optimisation, and certification path for first arrays.

Open ocean waves

Pre-seed

Capital buys the 1:3 pilot,
KPIs, and first customers.

Build 1:10 optimisation and mooring R&D, 1:3 pilot hardware, standard BOS kit, and instrumentation. Prove telemetry, availability and retrieval KPIs, and shared mooring validation.